Electrical project check-up

Which electrical job should come first?

Five quick questions about your home, your panel, and what you are adding. Takes only a minute to see what we should check first.

How the electrical project check-up works

Five questions about what you want the work to do, your house, your panel and your timing, each answered with one tap. It takes about a minute, and you see your result before we ask for any contact details.

The five questions

  1. 1. What do you want the electrical work to do?

    • Charge an EV at home: A Level 2 charger on its own circuit, in the garage or by the driveway.
    • Keep the power on in an outage: The last storm cost you heat, a sump pump or a freezer.
    • Run a heat pump: Mini-splits or a ducted system taking over from oil or propane.
    • Make room for more: A remodel, an addition, a hot tub, or a panel with no open slots.
    • Fix something that is wrong: Breakers trip, outlets are dead, or the lights flicker.
    • Clear an inspection item: A home inspector, an insurer or the town flagged the wiring.
  2. 2. How old is your home?

    • Built in the last 20 years: Modern breakers, and often a 200-amp panel already.
    • 1980s or 1990s: Solid wiring, but the panel may be full.
    • 1950s to 1970s: Often a 100-amp service and a few surprises behind the walls.
    • Older than 1950: Plaster walls, and wiring that may still include knob-and-tube.
  3. 3. What does the main breaker in your panel say?

    • 200 amps or more: Usually room for a charger, a heat pump or a generator hookup.
    • 100 amps: Common in older homes, and often the first thing to change.
    • Fuses, or 60 amps: A fuse box settles it: the panel comes before anything else.
    • Not sure: Normal. We read it off the main breaker on the first visit.
  4. 4. What else is coming in the next few years?

    • An EV: Even if the charger waits, the panel should plan for it.
    • A heat pump: Each indoor head or air handler needs its own circuit.
    • A generator or a battery: Backup that carries the circuits you choose.
    • A remodel or an addition: New rooms mean new circuits and more load.
    • A hot tub, a pool or a shop: A large new circuit that needs room in the panel.
    • Nothing else planned: Just this job, done right, with a look at what is there.
  5. 5. When do you want it done?

    • Right away, something is not working: A repair that cannot wait for a plan.
    • Before the next storm: Backup in place before the power goes out again.
    • Before heating season: The circuits ready when the heat pump goes in.
    • When the new car arrives: A charger working on the first night home.
    • Before the remodel starts: Panel room planned before the walls open.
    • Just pricing it out: A typical range first, decisions later.

Where your answers point

Your answers lead to one of five named first jobs, each with the first things we would check at your house. A fuse box or a 60-amp service puts the panel first, and a fault or a flagged item puts a safety check first.

  • The Panel Comes First

    Start with the panel, then build on it. We upgrade 100-amp services to 200 amps, coordinate the utility and pass inspection before we leave.

  • The EV-Ready Circuit

    Your next job is a charger on its own circuit. We check the panel first, run a dedicated circuit and mount the charger where the cable reaches.

  • The Heat Pump Circuit

    Give the heat pump the circuit it needs. Dedicated circuits and disconnects for mini-splits and ducted heat pumps, sized from the unit's nameplate.

  • The Backup Power Plan

    Your first job is power that stays on. A standby generator and automatic transfer switch bring the house back in seconds; an inlet and interlock is the lower-cost route.

  • Safety Check First

    Start with a look at the wiring you have. Dead outlets, tripping breakers and the items an inspector or the town flagged, traced and fixed.

If you want the full checklist, add your email and we send it. Every result links to the electrical price-range request for that job, and an owner replies the same business day with a typical range. The firm price comes in writing after we see the panel.