A Level 2 charger on its own circuit, sized to your panel and your parking spot.
The short answer
The panel decides the job
EV charger installation is mounting a Level 2 charger and running a dedicated 240-volt circuit to it from your panel. The distance from the panel to where you park moves the price most; your own price comes in writing after we see the panel.
Priced after a look
Every job of this kind is different, so an owner replies the same business day with a typical range, and the exact price comes in writing after we see it.
Confirmed after a site visit
A Level 2 charger needs its own 240-volt circuit, often 40 to 60 amps. We check the panel first: if it has the capacity and a free space, the job is a circuit, a cable run and the charger. If it does not, you hear that before any work starts, along with the options, from load management to a panel upgrade.

Panel and parking check
We check panel capacity and measure the run to where you park.
A firm price
Charger, circuit and permit, in writing.
Install and test
We mount the charger, run the circuit, pass inspection and charge your car with you.
Charging at home
A charger that fits the house

Panel checked first
No surprises after the charger is on the wall.

Clean cable run
Neat, protected and the shortest safe path.

Indoor or outdoor
Mounted where your cable actually reaches.
Planning ahead
An EV and a heat pump on one panel
Many homeowners add an EV and a heat pump within a few years of each other. Planning both on one load calculation tells you whether the panel can carry them together, and keeps the second job from undoing the first.

Questions
EV Chargers: common questions
Is there still a federal tax credit for home chargers?
No. The federal EV charger credit (30C) ended for chargers placed in service after Jun 30, 2026. Rates last checked Oct 21, 2026.
Do I need a panel upgrade for an EV charger?
Not always. Many 200-amp panels have room. A 100-amp panel often does not, especially with a heat pump on it too; a load calculation tells you which.
Related work
Often done in the same visit

Panel Upgrades
100A to 200A, permitted and inspected, ready for any future power upgrade.

Heat Pump Wiring
Dedicated circuits and disconnects for mini-splits and ducted heat pumps.

Standby Generators
A whole-home generator that starts on its own when the power drops.
Get a typical price range, then a firm quote after a look
Tell us the job and the town. An owner replies the same business day with a typical range, and the exact price comes in writing after we see the panel.