Skip to content
Call
White heat-pump condenser on a black stand against cedar shingles, with a disconnect and line cover, on a frosty morning

Electrical · Heat pumps

Heat Pump Wiring in MA, NH & ME

Dedicated circuits and disconnects for mini-splits and ducted heat pumps.

The short answer

Read the nameplate, then the panel

Heat pump wiring is the electrical side of a heat pump install: the dedicated circuit, the outdoor disconnect and the panel capacity the unit needs. Your HVAC installer sets the unit; we give it the power.

Priced after a look

Every job of this kind is different, so an owner replies the same business day with a typical range, and the exact price comes in writing after we see it.

Confirmed after a site visit

Every heat pump lists its circuit size on the nameplate. We size the breaker and wire to it, mount a weatherproof disconnect within sight of the outdoor unit, and confirm the panel can carry the new load on the coldest day of the year. If the panel is short on room, we plan the upgrade with you before the HVAC crew arrives, so the install day is not held up.

Clean concrete basement where a closed gray panel sends one conduit along the joists to a junction box by a frosty window
  1. Get the unit specs

    From you or your HVAC installer: the model and its circuit size.

  2. Check the panel

    A load calculation with the heat pump added, and a plan if it does not fit.

  3. Wire and inspect

    Circuit, disconnect and inspection, timed to the HVAC install.

Heat pump ready

The electrical side, done before install day

Close view of frost on the top corner of an outdoor heat-pump unit, its round fan guard and a blank metal side plate

Sized to the nameplate

The right breaker and wire for the unit.

Gray disconnect on white siding, its flexible conduit curving down past the top of a condenser, on a frosty late-autumn day

Disconnect in sight

Mounted beside the outdoor unit, to code.

Heat-pump condenser on black wall brackets with a disconnect and line cover, a pallet and folded moving blanket below

Timed to the HVAC crew

Power ready the day the unit is set.

Leaving oil, propane

Switching fuels changes the panel math

Moving from an oil or propane boiler to heat pumps shifts the house's heating load onto the electrical panel. That is the moment to check capacity, and often the moment to plan for an EV charger too, so the panel is only changed once.

Bare finished basement with an oval oil tank on steel legs in the corner and a closed gray panel on the far wall

Questions

Heat Pump Wiring: common questions

Get a price range
Does a heat pump need its own circuit?

Yes. Each outdoor unit needs a dedicated circuit sized to its nameplate, plus a disconnect within sight of the unit.

Will I need a panel upgrade for a heat pump?

Sometimes. Homes moving off oil or propane often add a large new load, and a 100-amp panel may not carry it with everything else. We run the numbers first.

Do you work with my HVAC company?

Yes. We schedule the electrical work around their install date so the system can be started the day it is set.

Get a typical price range, then a firm quote after a look

Tell us the job and the town. An owner replies the same business day with a typical range, and the exact price comes in writing after we see the panel.

Read our Google reviews⁠